February 2024 workshop: Moon to Mars Program Office Updates

Document: 02-2024-architecture-workshop-moon-to-mars-program-office-updates.pdf, 18 slides, 4,874,467 bytes, from https://www.nasa.gov/wp-content/uploads/2024/02/, fetched 2026-10-01T18:28:03Z (sources/manifest.csv). Title slide: "Moon to Mars Program Office Updates" (slide 1, image); no presenter or date is printed. Footer: "2024 Moon to Mars Architecture Workshops". Listed on the Architecture Workshops page under "February 2024". Text: sources/text/docs/2024-02-02-2024-architecture-workshop-moon-to-mars-program-office-updates.txt; images in sources/raw/slides/2024-02-02-2024-architecture-workshop-moon-to-mars-program-office-updates/.

Rank and method. A program briefing, not the architecture of record (SCHEMA, "Workshop slides"), older than Rev B and Rev C, and older than the March 2026 restructuring of Artemis. It shows the Artemis campaign as planned in February 2024; its content goes in "In the February 2024 workshop briefing" lines. All 18 slides were read in the text layer; the images of slides 1 (text-poor), 2, 3, 4, 13 and 16 were viewed. The text has no "Moon Base", "CUI" or "Pre-Decisional" (searched).

Summary. The Moon to Mars Program Office: what it does and how it is organized; the Artemis missions I to V with their "firsts", "new elements" and "common elements"; Artemis II and III milestone charts and hardware photos. It is the February 2025 Program Office deck a year earlier: the mission slides match it closely (what differs). Two things are in neither that deck nor the ADD: an example of how an architecture use case flows down to program requirements (slide 4), and the HLS uncrewed mission milestones on the Artemis III chart (slide 13).

Slides

Slide Title (as printed) Content
1 "Moon to Mars Program Office Updates" Title (image)
2 "Moon to Mars Program Office Updates" The office and its programs
3 (none) Five panels, read from the image: "ARTEMIS I, First mission (uncrewed flight test)", "COMPLETE"; "ARTEMIS II, First crew", "CREW SELECTED"; "ARTEMIS III, First human surface landing"; "ARTEMIS IV, First lunar space station assembly mission"; "ARTEMIS V, Crewed mobile surface exploration, Gateway expansion"
4 "Implementing the Architecture" Requirements flow-down for a use case
5 "Artemis I" "MISSION COMPLETE: The Artemis I mission launched on November 16, 2022, and the Orion spacecraft successfully splashed down on December 11, 2022"; firsts: the integrated uncrewed flight test, "Demonstration of Orion heatshield at lunar re-entry conditions", "Science activities via payloads in Orion and CubeSats deployed from SLS"; new elements: SLS Block 1, Orion, "Mobile Launcher 1 and upgraded ground systems"
6 "Current Post-Artemis I Work" Avionics boxes "extracted for reuse on Artemis II"; "Heat shield removed on February 9"; capsule to the Armstrong Test Facility for environmental testing; "Significant damage to launch pad and systems being assessed—some repair work underway"
7 "Artemis II" Below
8 "Major Milestones for Artemis II" "Rev. K - As of 1/23/2024": about 60 milestone boxes, those "unique for crew config." starred, from parachute qualification to "ARTEMIS II LAUNCH"
9–11 "Artemis II Progress" Photos: crew and service module integration; the crew on the mobile launcher's access arm; the new liquid hydrogen sphere; all four RS-25 engines in the core stage; booster inspections; the first launch simulation; Underway Recovery Test 10; crew training
12 "Artemis III" Below
13 "Major Milestones For Artemis III" "Rev. H - As of 2/15/2024"
14–15 "Artemis III Progress" Photos: "Starship Human Landing System elevator astronaut testing"; "Starship second integrated flight test"; "AxEMU spacesuit during testing"; European Service Module-3 in Bremen; Crew Module-3; spacesuit tests at the Neutral Buoyancy Laboratory and the Johnson rock yard (JETT); "NASA's first robotic Moon rover, Volatiles Investigating Polar Exploration Rover (VIPER)" under assembly
16 "Artemis IV" Below
17 "Artemis IV Progress" Photos: SLS engine section; "Power and Propulsion Element (PPE) Solar Array Power Module"; "Habitation and Logistics Outpost After completion of final welds in Turin, Italy"; "PPE 12-kilowatt Solar Electric Propulsion Test"; the Artemis IV European Service Module; "The Advanced Electric Propulsion System qualification thruster"; the Artemis IV crew module pressure vessel
18 "Artemis V" Below

The Program Office (slide 2)

"The Program Office":

  • "Helps ensure that NASA successfully establishes a long-term lunar presence needed to prepare for humanity's next giant leap to the Red Planet"
  • "Focuses on hardware development, mission integration, and risk management functions for programs critical to the agency's exploration approach that uses Artemis missions at the Moon to open a new era of scientific discovery and prepare for human missions to Mars"
  • "Leads planning and analysis for long-lead developments to support human Mars missions"

"Artemis Programs under the Program Office": a "Transportation System Theme: Orion, Space Launch System, Exploration Ground Systems" and a "Lunar System Development Theme: Gateway, Extravehicular Activity and Human Surface Mobility Program (EHP), Human Landing System (HLS), Mars Campaign Office (MCO)".

The organization chart, read from the image: under the "Office of the Associate Administrator", the "Strategy and Architecture Office", the "Moon to Mars Program Office" and the "ESDMD Business Office" (all HQ); below them the Mars Campaign Office, the Safety and Mission Assurance Office, the "Systems Engineering and Integration Office" and the Program Planning and Control Office (all HQ), and Exploration Operations (JSC); and six programs: EVA and Human Surface Mobility (JSC), Exploration Ground Systems (KSC), Gateway (JSC), Human Landing System (MSFC), Orion (JSC), Space Launch System (MSFC). "*Strategy and Architecture and SE&I have direct integration with SMD and STMD."

The chart puts the Strategy and Architecture Office, which leads the architecture, beside the Program Office, not under it; the element initiation breakout says "SAO leads architecture and strategy until acquisition strategy", then "M2MPO leads implementation and mission execution" (the pairing is the wiki's).

Requirements flow-down (slide 4)

"Implementing the Architecture"; "Requirements Flow Down for Use Case 001: Crew and supporting system(s) transit from Earth to cislunar space". Four columns joined by lines, read from the image, right to left: "ESDMD-001 Use Case", "ESDMD-001 Functions", "ACD-50007 ConOps Capabilities", "Requirements". ESDMD-001 is the ADD's document number (ADD Rev C); the deck doesn't expand "ACD-50007", "ACD-R" or "CESD-R", and the wiki doesn't either.

ESDMD-001 function (as printed) ACD-50007 ConOps capability Requirements
F-004-L Enable vehicle launch(es) A.1.3 Enable Vehicle Launch CESD-R-31 Day/Night Operations; CESD-R-34 Launch Azimuth; CESD-R-35 Liftoff Clearance; CESD-R-30 Pad Stay Time
F-003-L Manage consumables and propellant A.3.10 Manage Consumables and Propellant CESD-R-24 Orion Propellant Tank Loading; CESD-R-33 Prelaunch Stable Replenish Hold Time
F-006-L Enable abort(s) to safety A.6.2 Provide Aborts ACD-R-9 Cis-lunar Aborts Capability; ACD-R-22 Loss of Crew; CESD-R-16 Loss of Crew; CESD-R-40 Mission Abort
F-001-L Provide ground services A.1.1 Provide Ground Services ACD-R-32 Systems as Space Launch System Co-Manifested Payload
F-005-L Allow multiple launch attempts A.6.1 Provide Multiple Launch Attempts CESD-R-32 Launch Attempts; CESD-R-15 Launch Rate; CESD-R-30 Pad Stay Time
F-002-L Stack and integrate system(s) A.1.2 Stack and Integrate ACD-R-32 Systems as Space Launch System Co-Manifested Payload; CESD-R-26 Block 1B and Block 2B Co-Manifested Payload Volume; CESD-R-12 Payload Fairings
F-007-L Transport crew and crew system(s) from Earth to cislunar space A.2.1 Provide Flight Performance ACD-R-20 Crewed Lunar Orbit Destinations; ACD-R-34 Solar Electric Propulsion; CESD-R-28 Cislunar Element Delivery; CESD-R-11 Lift Capability; CESD-R-37 Low Earth Orbit (LEO) Loiter; CESD-R-13 Orbital Insertion Accuracy; CESD-R-5 Orion Control Mass; CESD-R-25 SLS TLI Capability

All seven functions feed "UC-001-L Crew and supporting system(s) transit from Earth to cislunar space". The IDs are plain three-digit numbers with "-L", like the Rev A function IDs a February 2025 briefing prints, though that briefing writes "FN-018-L" where this slide writes "F-004-L" (logistics briefing, 2025; the wiki's comparison). Rev C's IDs carry a sub-architecture letter and a numbered group (FN-T-107 L; Use cases and functions). Rev C has a function "Enable crew habitation during transit from Earth to cislunar space" (FN-T-107 L), but the wiki hasn't matched UC-001-L or F-001-L to F-007-L to Rev C IDs. The slide is the only source the wiki holds that shows the step below the ADD's functions: Rev C's decomposition figure draws "Design Reference Missions / ConOps" and "Elements / Requirements" at "Program Level" (Objective decomposition).

Artemis I to V as planned in February 2024

As printed (slides 7, 12, 16, 18).

Mission "Artemis firsts" "New elements" "Common elements"
Artemis II "Crewed integrated flight test of the Space Launch System (SLS) rocket, Orion spacecraft, and Exploration Ground Systems (EGS) at Kennedy Space Center"; "Demonstration of Orion life support systems"; "Human data collection in transit to and from the Moon, in lunar orbit, and through reentry and splashdown"; "Conducting new science and technology demonstrations in orbit" "Orion life support systems"; "Launch Complex 39B emergency egress system for crew and new liquid hydrogen system" "SLS rocket Block 1 configuration"; "Orion crew spacecraft"; "Mobile Launcher 1 and upgraded ground systems"
Artemis III "Human landing in South Pole region"; "Orion to human landing system direct mission including crew docking activity"; "Use of Near Rectilinear Halo Orbit (NRHO)"; "Four astronauts to lunar orbit"; "Two astronauts to lunar surface to collect scientific samples and data"; "Conducting new science and technology demonstrations" "Orion full up rendezvous, proximity operations, and docking systems"; "SpaceX Starship human landing system"; "Axiom advanced spacesuits and tools to explore the surface and collect samples" Block 1, Orion, Mobile Launcher 1
Artemis IV "Crewed mission to Gateway space station"; "Launch, delivery, and integration of a space station module in lunar orbit"; "Crew transfer from Orion to human landing system (HLS) via Gateway"; "Deep Space Logistics flight to Gateway"; "Conducting new science and technology demonstrations" "Space Launch System rocket Block 1B configuration Mobile Launcher 2 with supporting ground systems" (one bullet); "SpaceX Sustaining Starship HLS"; "Gateway modules: Power and Propulsion Element and Habitation and Logistics Outpost (pre-staged in orbit); International Habitat (launched on SLS Block 1B alongside the crew aboard Orion); Deep Space Logistics" "Common SLS elements"; "Orion crew spacecraft"; "Spacesuits and support systems"
Artemis V "Use of the lunar terrain vehicle (LTV) rover by crew to access more of the lunar surface and collect diverse scientific samples"; "Use of second lunar lander design"; "Use of new RS-25 engines" "Blue Moon human landing system"; "LTV unpressurized rover with scientific instruments"; "Gateway modules: ESPRIT Refueling Module (European System Providing Refueling Infrastructure and Telecommunications), Canadarm3 robotic arm" Block 1B; Orion; "Mobile Launcher 2 with supporting ground systems"; "Spacesuits and support systems"; "Gateway space station and Deep Space Logistics"; "Conducting science and demonstrating technology in orbit and on the surface"

Artemis II also lists "ENSURING CREW SAFETY: Addressing a battery issue and a circuitry component responsible for air ventilation and temperature control in Orion, and investigating root cause of char loss from the Artemis I heat shield" (slide 7). No slide gives a year for Artemis III, IV or V.

Against the February 2025 deck

The wiki's comparison with the February 2025 Program Office deck. The plan held for a year; the wording moved:

  • Artemis II. 2025 adds "Active Orion Launch Abort System (LAS)" and "Proximity operations demonstrations" to the firsts; 2024's common element is "Mobile Launcher 1 and upgraded ground systems", 2025's "Mobile Launcher 1".
  • Artemis III. 2024 names providers for both new elements, "SpaceX Starship human landing system" and "Axiom advanced spacesuits"; 2025 has "Starship human landing system" and "Advanced spacesuits". 2025 adds "and return" to the South Pole landing.
  • Artemis IV. Identical new elements, including "SpaceX Sustaining Starship HLS" and the Gateway modules. 2024's "Deep Space Logistics flight to Gateway" is a "Precursor" flight in 2025; "Gateway space station" became "Gateway".
  • Artemis V. Identical firsts and new elements; 2024 lists two more common elements (Gateway and Deep Space Logistics; science and technology "in orbit and on the surface").

Both plans are superseded: NASA's March 2026 fact sheet made Artemis III an Earth-orbit test in 2027 and moved the first landing to Artemis IV, "early 2028" (Going back to the Moon). The topic page is Human Lunar Return.

The Artemis III milestones (slide 13)

"Rev. H - As of 2/15/2024", read from the image: about 50 milestone boxes, the first nine checked (among them "ICPS-3 Engine Delivery to ULA", "Motor Segments Complete" and "Orion Crew Module Adapter Complete"), from "NASA Docking System (NDS) Complete" to "Roll to Pad for Launch". Blue boxes are keyed "New milestones for Artemis III": among them "xEVAS Primary Life Support System Complete", "xEVAS Pressure Garment System Complete", "xEVAS HITL Vacuum Test Complete", "EHP – xEVAS Ready for Integration", "HLS Lunar Lander Launch" and "HLS Lunar Orbit Checkout Review (LOCR) Mission Ready". A row headed "HLS Uncrewed Mission Milestones": "HLS - Starship/Super Heavy Flight Test Complete" (checked), "Propellant Transfer Flight Test Complete", "Long Duration Flight Test Complete", "LC-39A Updates", "HLS Uncrewed Lunar Landing Demo Launch Complete", "Science Instrument(s) Delivery for HLS Integration".

The HLS uncrewed landing demonstration and the propellant transfer flight test are in no other source the wiki holds (a search of all source texts across line breaks; the only other "uncrewed lunar landing" is Blue Origin's Blue Moon Mark 1 on the Moon Base Phases page, a different mission). See Human Landing System.

Oddities

As printed, images checked:

  • "Charlie Blackw ellThompson" and "countdow n" in the text layer (slide 11); the image is correct.
  • "Mobile Launcher 1" and "Mobile Launcher 2" listed among "new" and "common elements", as in 2025.
  • The Artemis IV slide runs SLS Block 1B and Mobile Launcher 2 into one bullet (slide 16, image).
  • "Block 1B and Block 2B Co-Manifested Payload Volume" (slide 4): Rev C's SLS variants are Block 1, 1B and 2, with crew and cargo forms (SLS); "Block 2B" is in no other source text (searched).