Timeline of Past and Future CLPS Deliveries¶
Document: a one-page PDF graphic, no author, no date printed. NASA's upload path is 2025/07, so the wiki
dates it July 2025, older than ADD Rev C (December 2025).
https://www.nasa.gov/wp-content/uploads/2025/07/clps-timeline-graphic-1.pdf. Fetched 2026-10-02T04:03:23Z;
287,050 bytes; SHA-256 6827a23f…3d78 (sources/manifest.csv). Files:
sources/text/docs/2025-07-clps-timeline-graphic-1.txt, sources/raw/docs/2025-07-clps-timeline-graphic-1.pdf.
Summary. Eleven CLPS deliveries, each with a lander picture, on a 2024–2028 axis: four flown, with dates, and seven "Future planned deliveries", marked with an asterisk, that "are placed on the timeline by year only, and their order within each year is not exact" (footnote). It names no payloads, sites or Moon Base phase. Read from the PDF page as an image: the text layer lists the year labels out of order (2024, 2026, 2025, 2027, 2028) and mixes the captions, so it can't be used to place a delivery in a year. Its content is on CLPS.
The deliveries, in order along the axis¶
| # | Provider | Mission | Above or below the axis | What the graphic says | Between the year labels |
|---|---|---|---|---|---|
| 1 | Astrobotic Technology | Peregrine Mission One | above | "Launched Jan. 8, 2024", "No lunar landing" | 2024 and 2025 |
| 2 | Intuitive Machines | IM-1 Mission | below | "Launched Feb.15, 2024", "Landed Feb. 22, 2024" | 2024 and 2025 |
| 3 | Firefly Aerospace | Blue Ghost Mission 1 | above | "Launched Jan. 15, 2025", "Landed Mar. 2, 2025" | 2025 and 2026 |
| 4 | Intuitive Machines | IM-2 Mission | below | "Launched Feb.27, 2025", "Landed Mar. 6, 2025" | 2025 and 2026 |
| 5 | Blue Origin* | Blue Moon Mark 1 Mission | above | planned | 2025 and 2026 |
| 6 | Astrobotic Technology* | Griffin Mission One | below | planned | 2025 and 2026 |
| 7 | Intuitive Machines* | IM-3 Mission | above | planned | 2026 and 2027 |
| 8 | Firefly Aerospace* | Blue Ghost Mission 2 | below | planned | 2026 and 2027 |
| 9 | Draper* | Draper Mission 1 | above | planned | 2027 and 2028 |
| 10 | Intuitive Machines* | IM-4 Mission | below | planned | 2027 and 2028 |
| 11 | Firefly Aerospace* | Blue Ghost Mission 3 | above | planned | right of 2028 |
Which year a planned delivery is in (the wiki's reading). The four dated deliveries, all launched in January or February, sit just right of their year's label. Read that way, each label marks the start of its year, and the graphic places Blue Moon Mark 1 and Griffin Mission One in 2025, IM-3 and Blue Ghost Mission 2 in 2026, Draper Mission 1 and IM-4 in 2027, and Blue Ghost Mission 3 in 2028. The graphic is not drawn to scale (the markers are evenly spaced), so this is a reading, not a printed date.
Against the newer sources (the wiki's comparison)¶
- Griffin's provider. The graphic names "Astrobotic Technology" for Griffin Mission One, as do the May 2026 release, the speech and the podcast; NASA's Moon Base Phases page names Voyager Technologies (open question 78).
- Dates. The 2026 Moon Base sources put Blue Moon MK1 "no earlier than fall 2026" and Griffin-1 "late 2026" (Missions and assets), later than 2025 under the reading above.
- Missions in no other source. Draper Mission 1, IM-4 and Blue Ghost Mission 3 appear in no other source the wiki holds.
- Counts. The graphic shows eleven deliveries from five providers. NASA's CLPS page counts "17 lunar deliveries to five CLPS vendors" (CLPS page); neither names the other's missions, so the two counts aren't reconciled.
Related pages¶
CLPS · Missions and assets · CLPS page